Hudson St. Parking Structure
Ridgewood, NJ
Structured Parking
Client: Village of Ridgewood
Project: Hudson Street Parking Structure
Epic’s Role: Design-Builder
Construction Costs: $11 million
Pre-construction, construction and close-out professional services for this new, four level, precast concrete parking structure.
Project Highlights: 246 space parking facility that provides parking for the adjacent Village of Ridgewood downtown area as well as commuters using the train station with a bicycle storage area. The garage was completed with patterned precast concrete integrating the structure with the historic downtown area of the Village of Ridgewood. The structure also serves as an easement for cars to access the loading and parking areas of the adjacent business.
Key Elements: The garage operates 24 hours per day, 365 days a year with an automated “pay on foot” revenue collection system allowing for efficient continuous garage operation. Extensive technology and camera equipment enable security operations to be efficiently monitored. Garage equipment includes an oil-water separator, a generator with a 3 day reservoir which can be filled through the exterior of the building, and a gate-less car counter system.
Related Projects
Learn More about Epic
We’re relentless in providing quality service to our customers.
Epic Management, Inc. has been an integral participant in thousands of projects since 1971. We look forward to bringing our hands on, roll-up-our sleeves work ethic to your next opportunity. Contact us today to get started.
Send us a Message
Copyright © 2020 Epic Management, Inc. All Rights Reserved. Sitemap | Privacy Policy